Description
Since Halloween I have created three prototype models for my project, I first drew the layout and then made a model in sketch up. I created a sports complex as idea one as it would be good for Derry to add to its sporting facilities and would also be a plus for the 2012 Olympic games. My second idea was a bar/restaurant/nightclub, the reason I chose this as it would be great to have a waterfront bar and restaurant and it would be hugely successful. My third idea was then a stadium for local teams; this would replace the Brandywell and Celtic Park which are both in much need for work which is why I think it would be great to add a new state of the art stadium.
Evaluation
The sports complex would I completed was done to a high standard but is easily expandable and more work is needed on the indoor facilities as I only developed the structure of the building and also the outdoor grounds and be developed with more detail.
The bar/restaurant/nightclub was completed as a rough idea to what I would like to see, there is not much detail added at the minute but can be easily expanded, I would also like to keep it very modern.
The third idea which is the stadium was developed quite basic only including the pitch and a rough idea of what way the seats could be placed and no real designs of the stadium and come in yet so a lot more work would be needed in this include changing rooms etc.
Time Management until Christmas
I will chose the sports complex as my idea and will work on developing the grounds and building structures, I will use class and study time effectively to achieve this, then after Christmas I will look into the indoor facilities.
Tuesday, November 13, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment